• WHAT WORK REQUIRES A PERMIT?
• HOW DO I SUBMIT PLANS FOR REVIEW?
• WHAT ARE THE BUILDING DEPT'S OFFICE HOURS?
• WHAT ARE THE REQUIRED DESIGN CRITERIA?
• HOW DO I ORDER BUILDING RECORDS?
What Is A Building Permit? (back to top)
to insure the health and safety of the public, The City of South Salt Lake requires that certain construction work can be performed only after a permit is obtained. Plans are reviewed prior to issuance of the permit for compliance with the current building codes. The work is then inspected during construction to confirm adherence to the approved plans and codes. A Certificate of Occupancy or approved final inspection is issued when the work is completed and in substantial compliance with code requirements.
Attention
Selected Mechanical, Plumbing, Electrical, and Roofing Permits may be submitted by fax.
Why Do I Need A Permit? (back to top)
The primary advantage of obtaining a permit is that it offers you the services of a building inspector, who inspects each phase of the construction process, ensuring work is done safely and properly. Inspectors can advise you on your options if you have difficulties.
There are legal and financial liabilities that you can face when you don’t get a permit. Work without a permit is illegal and can pose serious complications for you when you try to sell your house. Any fire and homeowner’s insurance you have may be invalidated if you do work without a permit. If there is a fire in your house, the insurance company may use the illegal work as an excuse not to pay on your claim.
When Do I Need A Permit? (back to top)
Call the building department at 483-6005. Discuss your plans with the code official before beginning construction to determine if you need a permit. Even if a permit is not needed, the code official will answer code questions and may provide valuable advice.
What Work Requires A Permit? (back to top)
There are four standard permits:
• Building Permit
• Plumbing Permit
• Mechanical Permit
• Electrical Permit
All structural and some nonstructural work on your home or business require permits. Permits are relatively simple to obtain. Bring your completed plans to the Building Department, speak with an Inspector and explain what you want to do. When you have completed the proper permit form, submit it with the necessary drawings. Please be aware that, depending on the degree of difficulty, 1st time plan reviews can vary from 1 day to 3 weeks. When in doubt the best way to find out if you need a permit is to call the South Salt Lake City Building Department (483-6005).
Permits are required for the following:
• New buildings
• Additions (bedrooms, bathrooms, family room, etc.)
• Residential work (garages, decks, fences, fireplaces, pools, water heaters, lawn sprinklers, etc)
• Renovations (garage conversions, basement finishes, kitchen expansions, re-roofing, etc.)
• Electrical installations (service upgrade, meter change, new branch circuits, etc.)
• Plumbing installations (gas, drain-waste-vent piping, water lines and new water softener installations)
• HVAC (heating, ventilating and air conditioning) installations
• Signs (wall, monument, pole and billboard)
How Do I Submit Plans For Review? (back to top)
When you submit plans are logged in at the Building Department for review, your plans will be reviewed by several departments. Plans are logged in and reviewed by each department in the following order: Zoning, Engineering/Public Works, Building, and the Fire Department. All plans are signed in and out thru the Building Department Secretary, Shawna Winter (483-6005). As each department reviews the plans, a review report will be written. Once the reviews have all been done, the listed contact person will be notified to pick up plans and reports, make the appropriate corrections and resubmit. Once all requirements have been met, your plan will be stamped approved, issued a permit number, fees assessed and the permit will be released for construction. Each department has other duties besides plan review so our review process could take a day or two or up to ten working days for the first review. Please plan ahead. Each department reviews plans in the order in which they are received. If you need to make changes and resubmit your plans, the plans will be forwarded to the department who asked for the corrections. They in turn will re-review the plans as they receive them.
We strongly urge you to review our check off list and your plans very carefully to make sure all requested information is included. This will expedite your plan review. If you have any questions about the review process, do not hesitate to call us.
What Are The Current Codes? (back to top)
CURRENT CODES ADOPTED BY SOUTH SALT LAKE CITY:
• 2006 International Building Code
• 2006 International Residential Code
• 2005 National Electrical Code
• 2006 International Plumbing Code
• 2006 International Mechanical Code
• 2006 International Fuel Gas Code
• 2006 International Energy Conservation Code
• 2006 International Fire Code
What Are the Office Hours of the Building Department? (back to top)
Owners and Contractors may apply for permits at City Hall, 220 East Morris Avenue (2430 So.), 1st floor between the hours of 8:00 a.m. and 5:00 p.m. Monday thru Friday. Permits with plans for review will not be accepted the last 15 minutes of the workday, due to an initial review that is required at the counter before acceptance of the permit application.
What Are the Permit fees? (back to top)
Fees are based on the valuation of the project as per 1997 Uniform Administrative Code, Table 3-A. Call the building department for permit fees.
What Are the Required Design Criteria? (back to top)
Per ESI Engineering Inc. Last update 6/29/04
CODE: IBC 2003; ASCE 7-02
WIND SPEED: 90 mph (3sec)
Exposure: Site specific. Most of SSLC is classified as exposure “B”
Code: For simple diaphragm buildings under 60 ft in height – use IBC 2003. For all other structures use – ASCE 7-02.
SEISMIC DESIGN CATEGORY: Site specific – SSLC is classified at a minimum as “D” with many sites requiring an “E” Classification depending upon site class and 1 second spectral response acceleration. (greater than 0.75g).
SITE CLASS: Site specific – SSLC may assume “D”. With essential facilities and irregular structures requiring site specific geographical analysis.
GEOTECHNICAL INFORMATION: All commercial projects require site specific geotechnical reports. The report shall include as a minimum: Field investigation; description of on site soil conditions; ground water elevation; soil preparation recommendations; allowable soil bearing; suitability of soils for proposed foundation system; liquefaction potential and recommended remedial action if required; recommended site class see IBC Table 1615.1.1.
SSLC recommends that all projects obtain a site specific geotechnical report.
SNOW LOAD: Site specific depending upon elevation with a minimum roof snow load (Pf) of 30 psf, and a minimum ground snow load (Pg) of 43 psf at a base elevation of 4,500 ft. The following chart may be used at higher elevations.
Elevation Pg (psf) Pf (psf)
4500 43 30
4750 46 32
5000 54 38
SEISMIC SNOW LOAD: At locations where roof snow load exceeds 30psf include 20% of the roof snow load in the effective seismic weight of the structure.
RAINFALL:
Return Period 15 min. 30 min. 1 hour 6 hour 12 hour 24 hour
10 year 0.54" 0.74" 0.94" 1.46" 1.79" 2.19"
100 year 0.82" 1.14" 1.46" 2.18" 2.70" 3.35"
How Do I Order Building Records? (back to top)
Download a SSLC Request for Records form, complete it and return to the Building Department. Records are general available in 3-4 working days, but occasionally may take up to 10 working days.
How Much Are Building Fees? (back to top)
Download a Building Department Fee schedule by clicking here.